s.no Name of the work/activity No.s Purpose Estimated Cost (in lakh)
1 Electrical of Sub-Station and 33 KV Line 1 Permanent solution to the voltage fluctuation problem 150.00
2 Electrical of DTR’S, 11 KV Lines To provide uninterrupted power supply 187.98
3 Current Consumption Charges Charges for the jathara period 70.00
Total 407.98

Erection of Sub-Station and 33 KV line

Erection of 33/11 KV SS at Medaram near English Medium School with 2x5.0 MVA Power Transforme

Erection of 33 KV line from Thadvai to Medaram by agumentation of existing 11 KV line

Erection of DTR's, 11 KV and LT Lines

Erection of 11 KV line with 100Sqmm conductor on existing poles and dismantling charges

Erection of Low tension line with 55 Sqmm conductor on existing poles and dismantling charges

Erection of LT AB Cable on existing 8.0 Mtrs poles and dismantling charges

provide 24 hrs uninterrupted power supply

provide sufficient number of transformers to avoid voltage fluctuations